POWER & ENERGY

Project case study

Client

Vestas

Market / Industry

Power & Energy

Project

Rotor & Drivetrain Lift, Hallett Wind Farm

Description

MAX Services heavy lift team conducted a rotor lift and drive train lift to undertake a main bearing replacement at Hallett Wind Farm.

The successful drivetrain lift was the first for an S88 turbine which pleased the client.

Our 500t Terex AC500-2 all terrain mobile crane was used to lift and remove the gearbox and rotors with support from a 130t Tadano ATF130G-5.

+61 8 8641 3955