Nyrstar Port Pirie Processing & Recovery Facility

REDEVELOPMENT UPDATE The drone image above shows a bird’s eye view of the main construction area from the eastern side of the site. In the foreground, from left to right the new hygiene flue and feed conveyor going into module 82 and also the East/West pipe rack going to the evaporative cooling tower module. In the […]

Adelaide Brighton Cement Fly Ash Silo Lift

Max Cranes were engaged to remove 2x hoppers from within the Adelaide Brighton Cement fly ash silo at the Port Augusta Power Station for McMahon Services. A Liebherr LTM1055-3.2 (55 tonne) was the crane of choice, Max Cranes also supplied intermediate riggers, boilermakers and a fire watcher. The Job was completed on time and within […]

Nyrstar Coal Grinding Filter Bag House Lift

Max Cranes supplied a Liebherr LTM1250-6.1 (250 tonne) to Nyrstar to lift and place the Coal Grinding Filter Baghouse. The 250t was rigged with 35 tonne of counterweight and 46.7 metres of main boom. The filter bag house weighed 16 tonnes which resulted in a crane utilisation of 65.7%. Max Cranes technical team scoped, CAD drafted lift study’s […]